Skip links

Modular Construction The Construction Solution of the Future

Consera is one of the pioneers of the transition from traditional construction processes to off-site production. In this way, we offer a combination of quality, speed and sustainability to both investors and users in all our projects.

What is Modular Construction?

Modular construction is a modern construction technique based on the production of large parts of buildings in a controlled factory environment according to predetermined standards and transported to the site as "modules". In this method, walls, floors, roof panels, wet areas and even electrical and mechanical infrastructures are completed on the production line. This minimizes the variable conditions on site and makes the process faster, more reliable and manageable with high quality standards.

Compared to traditional construction, this system optimizes both time and cost, while offering significant gains in terms of sustainability, safety and predictability. With advantages such as in-plant quality control, easier waste management and a reduced carbon footprint, modular construction has become one of the best solutions for today's requirements for speed, efficiency and environmental awareness.

Untitled design 2025 11 26T111743.845
0 2 min
DJI 0232 min

Advantages of Off-Site Systems

Why Modular Construction?

Modular systems not only reduce construction time, but also provide safer, sustainable and predictable projects. Consera's model eliminates uncertainties in the field and brings processes under control.

%50’ye varan zaman tasarrufu – eş zamanlı saha & fabrika üretimi

Reduced labor, safety and labor advantages on the construction site.

High quality control - in-factory testing and inspections

Low carbon emissions through waste management and industrial production.

Global portability and export opportunities

Min. due to the absence of column and beam protrusions. %5 net space gain.

Modular Steel Structure Comparison Criteria

Modular Building Solutions

Hotel

Housing

School

Hospital

Dormitory

Turkey's First Modular Apartment Project

Main Contractor : 
Location : 
Architectural Project :
Static Project : 
MEP Project :  
Completion Date : 
Project Duration : 
Number of Modules : 

Consera
Malatya, Turkey
Tangent Architecture
Meinhardt
Anka MEP
November 2025
6 months
320

@conseraoffsite

McKinsey October 2024 Report

We have evaluated McKinsey's October 2024 report, in which McKinsey emphasizes that modular construction will revolutionize the global construction industry and touches on striking topics such as the global housing crisis and the size of the construction industry.

Move construction from site to factory, experience parallel working processes...

Explore
Drag